Concrete and Drainage Upgrade
This project addressed recurring water pooling near entry doors and along the pathway after heavy rain. Working to an external engineer’s design, our team removed the affected concrete, improved the subgrade, and installed a sand blinding layer before placing reinforcing steel.
Coloured high-strength architectural concrete was poured with modern keyed expansion joints to ensure durability and a refined finish. A concealed drainage system with pits and pipework was also constructed to capture and redirect stormwater.
Client: First Church of Christ Scientist
Location: Barton
Year Completed:2020